Search

Leave a Message

Thank you for your message. I will be in touch with you shortly.

Browse Homes

Easements And View Corridors On Hawaii Loa Ridge

November 6, 2025

Planning a remodel on Hawaii Loa Ridge? The views are why you chose the ridge, but easements and HOA view rules can turn a great design into a costly redesign if you skip early checks. You want a smooth permit path, respectful neighbor relations, and no mid-project surprises. In this guide, you’ll learn what to review about lot lines, utility and drainage easements, and HOA view corridors before you sketch a plan or order materials. Let’s dive in.

Why easements and view rules matter

On ridge lots in the Kuliouou–Kalani Iki area of East Honolulu, recorded easements, plats, and CC&Rs control what you can build. Informal understandings usually do not hold up. A current boundary survey and a title report will reveal most of the constraints that affect design and siting.

Run two tracks in parallel. First, verify lot lines, setbacks, and recorded easements through title, plats, and surveys. Second, engage the HOA’s design review for view-related rules and community context. This two-track approach prevents redesigns and neighbor disputes later.

Start with records: TMK, title and survey

Your Tax Map Key (TMK) is your starting point. Use it to pull parcel data, permit history, and recorded instruments tied to your lot. With the TMK in hand, you can coordinate with title, survey, and permitting teams more efficiently.

Pull the right records

  • Honolulu Real Property Assessment Division parcel maps to confirm TMK and basic dimensions.
  • State of Hawaii Bureau of Conveyances to find deeds, recorded easements, plats, and CC&Rs.
  • County subdivision plats and any plat notes referenced in your deed.
  • City & County of Honolulu Department of Planning and Permitting permit files for prior approvals, as-builts, and any recorded public easements.

Choose the right survey

  • Boundary survey to locate property corners and lot lines. This is essential if corners are unclear or the lot is irregular.
  • ALTA/NSPS survey for comprehensive projects or financing. It maps visible improvements and easements shown in title.
  • Improvement location certificate or topographic survey for smaller remodels to check structures against setbacks and easements.

On steep, hilly lots like Hawaii Loa Ridge, get a current, signed boundary survey if it is more than 5 to 10 years old. Compare the survey to the recorded plat and deed legal description. If corner monuments are missing or moved, have a licensed land surveyor re-establish them.

Common easements on ridge lots

Utility easements

Look for recorded utility easements in favor of Hawaiian Electric, the Board of Water Supply, and telecom providers. These areas often restrict building, grading, and planting. Utilities may require access for maintenance or replacement, and overhead lines can affect tree height and roof features.

Drainage and stormwater easements

Drainage easements may cross your lot or run along boundaries. Permanent structures that impede flow are typically prohibited, and access for maintenance may be required. Even without a recorded easement, regrading a slope can change runoff and create liability. Civil engineering review is prudent on ridge sites.

Access and shared driveways

Shared driveway and ingress/egress easements are common in hillside subdivisions. They often include maintenance obligations and limits on changing widths or grades. Confirm any shared access agreements before construction.

View and scenic easements

A view easement must be recorded to create an enforceable right to a view. Without a recorded view easement or covenant, views are generally not a guaranteed legal right. Some CC&Rs include extra view protections that are stricter than city rules and enforced by the HOA.

Releases and relocations

Recorded easements are not easy to remove or move. You usually need the easement holder’s written consent and a recorded release or modification. Public or government-dedicated easements are less likely to be released.

HOA and view corridors on Hawaii Loa Ridge

Gather the governing documents

Request the CC&Rs and any amendments, architectural guidelines, and the Design Review Committee application process. Minutes from recent HOA meetings and DRC decisions help you see how rules are applied and how strictly view issues are enforced.

Typical design controls

Expect requirements for pre-approval of exterior changes, additions, rooflines, grading, and tree removal. Rules can include height limits, roof material and pitch, exterior palettes, and lighting. Landscaping and tree maintenance policies often address who must trim or remove trees that affect established view corridors.

Work with the DRC early

Ask for the DRC submittal checklist, required drawings, and typical timelines. Consider a conceptual review before final design to reduce surprises. If a property manager maintains standing interpretations or sample approvals, study them for precedent.

City and County permitting basics

What DPP reviews

Building permits are checked for zoning setbacks, maximum height, lot coverage, and known public easements. Retaining walls, grading, and drainage features often trigger added engineering and stormwater review. Trees in public rights-of-way may require separate consent or permits to trim or remove.

Use county records to your advantage

Use your TMK to pull permit history and any public easements shown on county maps. As-built drawings and past permits can reveal prior encroachments or approvals that inform current design.

Loop in neighbors

Some permits or HOA processes require adjacent-neighbor notification. Even when not required, early outreach is a smart way to reduce objections during reviews.

Pre-remodel checklist

  • Current deed, chain of title, and a preliminary title report listing easements and encumbrances.
  • Recorded plat(s), subdivision notes, and any recorded restrictions.
  • HOA CC&Rs, Bylaws, Architectural Guidelines, recent DRC decisions, and meeting minutes.
  • TMK, parcel map, and county permit history.
  • A current boundary survey or ILC; order an ALTA/NSPS survey for major projects.
  • Utility locate and facility maps from electric, water, and telecom providers.
  • Civil or geotechnical engineer review for drainage, footings, and slope stability.
  • ISA-certified arborist evaluation for mature trees, root zones, and trimming/removal impacts.
  • Title company or real estate attorney input on easement interpretation or needed releases.
  • Early DRC contact for submittal requirements and timelines; consider a pre-application touchpoint with DPP.

Avoid common pitfalls

  • Building or planting in a recorded utility or drainage easement, which can trigger removals and redesigns.
  • Regrading that alters runoff and leads to neighbor flooding or damage.
  • Removing or topping trees without HOA approval when neighbors rely on them for buffers, or planting tall trees that block ocean views.
  • Skipping HOA architectural approval and facing stop-work orders or fines.
  • Overlooking shared driveway maintenance agreements that affect access during construction.
  • Assuming no recorded easement means the area is free, without checking plats or survey notes.

Timeline: a realistic roadmap

  • Week 0 to 2: Gather deed, TMK, parcel map, HOA documents, and permit history. Order a title report.
  • Week 1 to 6: Commission surveys and utility locates. Consult the DRC informally and request utility facility maps.
  • Week 3 to 8: Refine civil and architectural design to fit survey and easement constraints. Submit the formal DRC package if required.
  • Week 4 to 12+: File permits with DPP, respond to plan-review comments, and coordinate any added stormwater or engineering requirements.

Easement releases or disputes can add significant time. Identify those early so you can plan around them.

When to call the pros

  • Licensed Hawaii land surveyor for boundary or ALTA surveys.
  • Title company or real estate attorney for title research, easement interpretation, and releases.
  • Civil or geotechnical engineer for grading, drainage, and retaining walls on slope.
  • Architect experienced with Honolulu DPP review and HOA design guidelines.
  • ISA-certified arborist for tree health, trimming plans, and permit guidance.
  • HOA manager or DRC contact for governing documents and checklists.

Bottom line

On Hawaii Loa Ridge, recorded documents and HOA rules shape what you can build and how your remodel moves through permits. Start with your TMK, title, and a current survey, then sync your design with HOA view protections and drainage realities. Early outreach to the HOA, neighbors, utilities, and your professional team saves time, money, and relationships.

If you want a clear plan for due diligence and next steps tailored to your property, let’s talk. Schedule your free consultation with Unknown Company.

FAQs

What is a view easement on Hawaii Loa Ridge?

  • A view easement is a recorded instrument that restricts building or vegetation to preserve a defined view; without a recorded easement or covenant, a view is generally not a guaranteed legal right.

How do I find my lot’s TMK and why does it matter?

  • The TMK uniquely identifies your parcel in Honolulu records; use it to pull permit history, recorded documents, and maps that inform surveys, design, and permitting.

Do I need a new boundary survey if I have an old one?

  • If your lot is steep or irregular, or the survey is older than 5 to 10 years, get a current signed boundary survey to confirm corners, setbacks, and any encroachments before finalizing plans.

Can I move a utility or drainage easement to fit my design?

  • Relocation usually requires the easement holder’s consent and a recorded modification; public or government-dedicated easements are unlikely to be released, so identify conflicts early.

Who enforces view rules: the HOA or the city?

  • The city enforces zoning and public-easement rules, while HOAs enforce CC&Rs and design guidelines; many ridge communities have view protections that are stricter than municipal code.

What permits do I need for grading or retaining walls?

  • DPP reviews grading, drainage, and retaining walls, often requiring engineering and stormwater measures; check requirements early to avoid delays.

Work With Andrew

From first viewings to final closings, I’m by your side to ensure every step is clear, enjoyable, and tailored just for you. Let’s team up and make your next move in Honolulu an absolute breeze.